laurinburg-solar-project

Laurinburg

State

North Carolina

Where is the project?

TWE Laurinburg is located in the service territory of Progress Energy Carolinas Inc. in Scotland County, North Carolina.

 

What transmission line does the project connect with?

The target project interconnection is a line tap of a 23 kV distribution line approximately 1 mile from a Progress substation.

 

What is the size of the project?

5 MW

 

Who is buying the power?

The power produced by the TWE Laurinburg Solar Project has been sold to Duke Progress.

 

When is the project expected to start operating?

The project began operating in December 2015

 

Who is the developer of the project?

Tradewind Energy, Inc.

 

Who owns the project?

The project is owned by FLS Energy.

 

Key Project Attribute:

  • TWE Laurinburg is sited on 47 acres of unobstructed ground with good visibility and accessibility from State Highway 74.
We could not find any location
We could not understand the location
  • - Make sure all street and city names are spelled correctly.
  • - Make sure your address includes a city and state.
  • - Try entering a zip code.
Search
Reset